top of page

礦港溪再造委托規劃設計工作 - 共月橋
Kuanggang Creek Reconstruction Planning & Design - Lunar Pedestrian Bridge  ( Under Construction )

Beitou, Taipei
Studio : Studio ++

Lunar Pedestrian Bridge is a project commissioned by CNHW International, as part of the Kuanggang Creek Reconstruction project. Studio ++ is assigned to design 2 of the pedestrian bridges in the riverpark, to provide a connection from surrounding roadsides towards the new riverpark. Lunar Pedestrian Bridge is designed to be a hanging-curved structure with no central pillar supports, which is a construction challenge that has never been done in Taiwan. The project has already passed the structural inspection, and is under construction preparation, which will be finished in 4 years span.

共月扶手軸測.jpg
平面01.jpg



Lunar Bridge - Master Plan
 



 

立面.jpg



Lunar Bridge - West Facade
 



 

立面.jpg



Lunar Bridge - South Facade
 

 

 



 

立面.jpg



Lunar Bridge - North Facade
 

 

 



 

共月軸測06.jpg



Lunar Bridge - Isometric
 





 



Lunar Bridge - Detailed Isometric
 

 

 



 

bottom of page